Notification of planned construction activity 4/21/25 thru 4/25/25 (Phase 2):

  • The contractor will be installing water and drainage utilities on Gulfstream Rd. between Middle Rd. and Golfview Dr.
  • Roadway, LLC will be performing the installation of new storm drainage and water utilities at Lakeview Dr between Polo Dr. and Gulfstream Rd.
  • The contractor will be installing new watermain and services at Bermuda Way.