Notification of planned construction activity 6/02/25 thru 6/08/25:
- The contractor will perform road removal and installation of the 1st lift of road rock base between Middle Road and Banyan Road.
- Roadway, LLC will also be installing storm drainage utilities between Lakeview Drive and Old School Road as well as installing water utilities at the corner of Gulfstream Road and Sea Road down to Bermuda Way.
For more information on the project, view the Project Overview.
Stay tuned to the website for future updates.