Notification of planned construction activity for 09/01/25 thru 09/07/25:
Roadway Construction plans to perform the following work activities:
- Remove road, install the 1st lift of base, and conduct storm drainage work on Gulfstream Road.
- Remove road and install the 1st lift of base on Sea Road between Gulfstream Road and Bermuda Way.
- Remove road, install the 1st lift of base, and conduct storm drainage work on Banyan Road between A1A and Gulfstream Road.
- Install storm drainage on Oleander Way between Lakeview Drive and Banyan Road.
- Remove road, install the 1st lift of base, and install water line and services on Lakeview Drive between A1A and Gulfstream Road.
- Install waterline and services on Golfview Drive East of Gulfstream Road.