Notification of planned construction activity for 10-27-25 through 11-02-25:

Roadway Constructions plans to perform the following work activities:

  • Conduct paving on Sea Road between Bermuda Way and A1A.
  • Pave one side of Banyan Road, remove road, and install the 1st lift of base on the other side of the road between Gulfstream Road and A1A.
  • Remove road, construct concrete valley gutters, and install base on Lakeview Drive between Gulfstream Road.
  • Continue with drainage work on Oleander Way between Lakeview Drive and Banyan Road.
  • Remove road, construct concrete valley gutters, and install base on Golfview Drive between Polo Drive and Gulfstream Road.
  • Pave Oleander Way North of Banyan Road.

Contractor Work Schedule 10/27 - 11/02